Monday, January 22, 2007

Fouling of Reactor Fuel at River Bend

This was presented at the 2004 International ANS Meeting on LWR Fuel Performance, September 20, 2004. Apparently this was never formally reported to the Nuclear Regulatory Commission. At least, I have not found an LER or Inspection Report or other documents that cover this. Please compare this with my entry of January 20, 2007 (12:14 PM, not the later post on that date). More soon on this.

An edit on February 14, 2007: An NRC inspection team finally caught up with this; see ML060600503, February 28, 2006 and my entry on this blog of February 12, 2007, Regulation by Myth,

No comments: